Azahar, N. F., Raja Muhammad Rooshdi, R. R., Ismail, N. A. A., Marhani, M. A., Sahamir, S. R., Wan Azahar, W. N. A., & Mohd Yunus, R. (2025). Determinant of escalating construction material costs in the post-pandemic period: Contractor’s perspective. Universiti Teknologi Mara.
Chicago Style (17th ed.) CitationAzahar, Nuramira Farhana, Raja Rafidah Raja Muhammad Rooshdi, Noor Akmal Adillah Ismail, Mohd Arif Marhani, Shaza Rina Sahamir, Wan Nur Aifa Wan Azahar, and Rihana Mohd Yunus. Determinant of Escalating Construction Material Costs in the Post-pandemic Period: Contractor’s Perspective. Universiti Teknologi Mara, 2025.
MLA (9th ed.) CitationAzahar, Nuramira Farhana, et al. Determinant of Escalating Construction Material Costs in the Post-pandemic Period: Contractor’s Perspective. Universiti Teknologi Mara, 2025.
