Optimising Turnaround Maintenance (TAM) For A Gas-Fired Power Plant.CW
保存先:
第一著者: | |
---|---|
フォーマット: | 学位論文 |
出版事項: |
2024
|
主題: | |
オンライン・アクセス: | http://utpedia.utp.edu.my/id/eprint/31254/ |
タグ: |
タグ追加
タグなし, このレコードへの初めてのタグを付けませんか!
|
id |
oai:utpedia.utp.edu.my:31254 |
---|---|
record_format |
eprints |
spelling |
oai:utpedia.utp.edu.my:312542025-03-11T20:59:10Z http://utpedia.utp.edu.my/id/eprint/31254/ Optimising Turnaround Maintenance (TAM) For A Gas-Fired Power Plant.CW Damilola Olumuyiwa, Olatujoye T Technology (General) 2024-05 Thesis NonPeerReviewed Damilola Olumuyiwa, Olatujoye (2024) Optimising Turnaround Maintenance (TAM) For A Gas-Fired Power Plant.CW. Masters thesis, UNIVERSITI TEKNOLOGI PETRONAS. |
institution |
Universiti Teknologi Petronas |
building |
UTP Resource Centre |
collection |
Institutional Repository |
continent |
Asia |
country |
Malaysia |
content_provider |
Universiti Teknologi Petronas |
content_source |
UTP Electronic and Digitized Intellectual Asset |
url_provider |
http://utpedia.utp.edu.my/ |
topic |
T Technology (General) |
spellingShingle |
T Technology (General) Damilola Olumuyiwa, Olatujoye Optimising Turnaround Maintenance (TAM) For A Gas-Fired Power Plant.CW |
format |
Thesis |
author |
Damilola Olumuyiwa, Olatujoye |
author_facet |
Damilola Olumuyiwa, Olatujoye |
author_sort |
Damilola Olumuyiwa, Olatujoye |
title |
Optimising Turnaround Maintenance (TAM) For A Gas-Fired Power Plant.CW |
title_short |
Optimising Turnaround Maintenance (TAM) For A Gas-Fired Power Plant.CW |
title_full |
Optimising Turnaround Maintenance (TAM) For A Gas-Fired Power Plant.CW |
title_fullStr |
Optimising Turnaround Maintenance (TAM) For A Gas-Fired Power Plant.CW |
title_full_unstemmed |
Optimising Turnaround Maintenance (TAM) For A Gas-Fired Power Plant.CW |
title_sort |
optimising turnaround maintenance (tam) for a gas-fired power plant.cw |
publishDate |
2024 |
url |
http://utpedia.utp.edu.my/id/eprint/31254/ |
_version_ |
1827444021449981952 |
score |
13.251813 |