On efficient construction and evaluation of runs rules–based control chart for known and unknown parameters under different distributions

In this study, we have considered two design structures of (Formula presented.) control chart by covering the situations of known and unknown parameters, variety of probability distributions, and runs rules. The design structures are dependent on constants which generally considered hard to compute...

全面介紹

Saved in:
書目詳細資料
Main Authors: Mehmood, Rashid, Lee, Muhammed Hisyam, Hussain, Shahzad, Muhammad Riaz, Muhammad Riaz
格式: Article
出版: John Wiley and Sons Inc. 2019
主題:
在線閱讀:http://eprints.utm.my/id/eprint/87585/
http://dx.doi.org/10.1002/qre.2423
標簽: 添加標簽
沒有標簽, 成為第一個標記此記錄!