Methodology to develop heuristic for re-entrant flow shop with two potential dominant machines using bottleneck approach
This paper presents a bottleneck-based methodology to solve scheduling problem of M1,M2,M3,M4,M3,M4 re-entrant flow shop where M1 and M4 have high tendency of being the dominant machines. Two generalised makespan algorithms using bottleneck approach were developed for the identified bottleneck...
Saved in:
Main Authors: | , |
---|---|
格式: | Article |
语言: | English |
出版: |
2012
|
主题: | |
在线阅读: | http://eprints.uthm.edu.my/8049/1/J4741_d0bca5a4021271c23fab3726ebba24d6.pdf http://eprints.uthm.edu.my/8049/ |
标签: |
添加标签
没有标签, 成为第一个标记此记录!
|