Methodology to develop heuristic for re-entrant flow shop with two potential dominant machines using bottleneck approach

This paper presents a bottleneck-based methodology to solve scheduling problem of M1,M2,M3,M4,M3,M4 re-entrant flow shop where M1 and M4 have high tendency of being the dominant machines. Two generalised makespan algorithms using bottleneck approach were developed for the identified bottleneck...

全面介绍

Saved in:
书目详细资料
Main Authors: Bareduan, Salleh Ahmad, Hasan, Sulaiman
格式: Article
语言:English
出版: 2012
主题:
在线阅读:http://eprints.uthm.edu.my/8049/1/J4741_d0bca5a4021271c23fab3726ebba24d6.pdf
http://eprints.uthm.edu.my/8049/
标签: 添加标签
没有标签, 成为第一个标记此记录!