Methodology to develop heuristic for re-entrant flow shop with two potential dominant machines using bottleneck approach

This paper presents a bottleneck-based methodology to solve scheduling problem of M1,M2,M3,M4,M3,M4 re-entrant flow shop where M1 and M4 have high tendency of being the dominant machines. Two generalised makespan algorithms using bottleneck approach were developed for the identified bottleneck...

全面介紹

Saved in:
書目詳細資料
Main Authors: Bareduan, Salleh Ahmad, Hasan, Sulaiman
格式: Article
語言:English
出版: 2012
主題:
在線閱讀:http://eprints.uthm.edu.my/8049/1/J4741_d0bca5a4021271c23fab3726ebba24d6.pdf
http://eprints.uthm.edu.my/8049/
標簽: 添加標簽
沒有標簽, 成為第一個標記此記錄!
實物特徵
總結:This paper presents a bottleneck-based methodology to solve scheduling problem of M1,M2,M3,M4,M3,M4 re-entrant flow shop where M1 and M4 have high tendency of being the dominant machines. Two generalised makespan algorithms using bottleneck approach were developed for the identified bottleneck. Each algorithm has specific correction factor which was used to ensure the accuracy of the makespan computation. Using these correction factors, a constructive heuristic was developed to solve for near-optimal scheduling sequence. For small size problems, the heuristic results were compared with the optimum makespan generated from complete enumeration. For medium and large size problems, the heuristic performance was measured by comparing its makespan with the solutions generated by the NEH and lowerbound. At weak and strong dominance level, the heuristic shows good performance against the lowerbound and better results compared to the NEH for large and medium size problems.