Agents for Fuzzy Indices of Reliability Power System with Uncertainty Using Monte Carlo Algorithm
The standard deviation of load level uncertainty in power system reliability assessment has a different value for each load level leading to complexity iterations required in the convergence of Monte Carlo algorithm. In this present work, the fuzzy system agent perspective would be used to control...
Saved in:
Main Authors: | Shalash, Nadheer A., Abu Zaharin, Ahmad |
---|---|
格式: | Conference or Workshop Item |
語言: | English |
出版: |
2014
|
主題: | |
在線閱讀: | http://umpir.ump.edu.my/id/eprint/5804/4/Agents_for_fuzzy_indices_of_reliability_power_system_with_uncertainty_using_Monte_Carlo_algorithm.pdf http://umpir.ump.edu.my/id/eprint/5804/ http://dx.doi.org/10.1109/PEOCO.2014.6814436 |
標簽: |
添加標簽
沒有標簽, 成為第一個標記此記錄!
|
相似書籍
-
Fuzzy-based multi-agent approach for reliability assessment and improvement of power system protection
由: Nadheer Abdulridha, Shalash
出版: (2015) -
New Reliability Index for Power System Protection Based On Multi-Agent Technique
由: Shalash, Nadheer A., et al.
出版: (2013) -
Reliability Assessment for Tie Line Capacity Assistance of Power Systems Based on Multi-Agent System
由: Abu Zaharin, Ahmad, et al.
出版: (2014) -
Risk evaluation of uncertainties in generation scheduling using Monte Carlo simulation
由: Usman, M. D. M., et al.
出版: (2012) -
Low voltage reliability equivalent using monte-carlo simulation technique
由: Noorfatin Farhanie, Mohd Fauzi, et al.
出版: (2019)