Micro-Hydro Energy Estimation for Hydrokinetic Energy Harnessing at Sungai Lembing

The hydrokinetic system is an electromechanical device that has been used to harness the electricity in the river stream or marine environment. The system is considered as a promising renewable energy resource especially at the remote areas near to the river. This paper presents the results of the s...

وصف كامل

محفوظ في:
التفاصيل البيبلوغرافية
المؤلفون الرئيسيون: Wan Ismail, Ibrahim, Raja Mohd Taufika, Raja Ismail, Mohamed, Mohd Rusllim
التنسيق: Conference or Workshop Item
اللغة:English
منشور في: Springer Singapore 2019
الموضوعات:
الوصول للمادة أونلاين:http://umpir.ump.edu.my/id/eprint/27814/1/Micro-Hydro%20Energy%20Estimation%20for%20Hydrokinetic1.pdf
http://umpir.ump.edu.my/id/eprint/27814/
https://doi.org/10.1007/978-981-13-3708-6_49
الوسوم: إضافة وسم
لا توجد وسوم, كن أول من يضع وسما على هذه التسجيلة!
id my.ump.umpir.27814
record_format eprints
spelling my.ump.umpir.278142020-07-08T03:43:24Z http://umpir.ump.edu.my/id/eprint/27814/ Micro-Hydro Energy Estimation for Hydrokinetic Energy Harnessing at Sungai Lembing Wan Ismail, Ibrahim Raja Mohd Taufika, Raja Ismail Mohamed, Mohd Rusllim TK Electrical engineering. Electronics Nuclear engineering The hydrokinetic system is an electromechanical device that has been used to harness the electricity in the river stream or marine environment. The system is considered as a promising renewable energy resource especially at the remote areas near to the river. This paper presents the results of the site investigation on the hydrokinetic potential at Pasir Kubur River, Sungai Lembing Kuantan. From the analysis, it is shown that from the sampling measurement, the average water velocity is 1.1 m/s while the depth at the Station 2 is ranging between 0.55 and 5.0 m. The estimated output power is between 200 and 500 W depending on water velocity (V) and the swept area (A) of the turbines. Consequently, based on these results, the total annual energy yield can be achieved between 1.8 up to 4 MWh at the average water velocity of 1.1 m/s with 1.0 and 1.5 m2 turbines swept area respectively. Springer Singapore 2019-03-16 Conference or Workshop Item PeerReviewed pdf en http://umpir.ump.edu.my/id/eprint/27814/1/Micro-Hydro%20Energy%20Estimation%20for%20Hydrokinetic1.pdf Wan Ismail, Ibrahim and Raja Mohd Taufika, Raja Ismail and Mohamed, Mohd Rusllim (2019) Micro-Hydro Energy Estimation for Hydrokinetic Energy Harnessing at Sungai Lembing. In: Proceedings of the 10th National Technical Seminar on Underwater System Technology 2018, 27-28 September 2018 , Universiti Malaysia Pahang. pp. 549-562., 13. ISBN 978-981-13-3707-9 https://doi.org/10.1007/978-981-13-3708-6_49 10.1007/978-981-13-3708-6
institution Universiti Malaysia Pahang Al-Sultan Abdullah
building UMPSA Library
collection Institutional Repository
continent Asia
country Malaysia
content_provider Universiti Malaysia Pahang Al-Sultan Abdullah
content_source UMPSA Institutional Repository
url_provider http://umpir.ump.edu.my/
language English
topic TK Electrical engineering. Electronics Nuclear engineering
spellingShingle TK Electrical engineering. Electronics Nuclear engineering
Wan Ismail, Ibrahim
Raja Mohd Taufika, Raja Ismail
Mohamed, Mohd Rusllim
Micro-Hydro Energy Estimation for Hydrokinetic Energy Harnessing at Sungai Lembing
description The hydrokinetic system is an electromechanical device that has been used to harness the electricity in the river stream or marine environment. The system is considered as a promising renewable energy resource especially at the remote areas near to the river. This paper presents the results of the site investigation on the hydrokinetic potential at Pasir Kubur River, Sungai Lembing Kuantan. From the analysis, it is shown that from the sampling measurement, the average water velocity is 1.1 m/s while the depth at the Station 2 is ranging between 0.55 and 5.0 m. The estimated output power is between 200 and 500 W depending on water velocity (V) and the swept area (A) of the turbines. Consequently, based on these results, the total annual energy yield can be achieved between 1.8 up to 4 MWh at the average water velocity of 1.1 m/s with 1.0 and 1.5 m2 turbines swept area respectively.
format Conference or Workshop Item
author Wan Ismail, Ibrahim
Raja Mohd Taufika, Raja Ismail
Mohamed, Mohd Rusllim
author_facet Wan Ismail, Ibrahim
Raja Mohd Taufika, Raja Ismail
Mohamed, Mohd Rusllim
author_sort Wan Ismail, Ibrahim
title Micro-Hydro Energy Estimation for Hydrokinetic Energy Harnessing at Sungai Lembing
title_short Micro-Hydro Energy Estimation for Hydrokinetic Energy Harnessing at Sungai Lembing
title_full Micro-Hydro Energy Estimation for Hydrokinetic Energy Harnessing at Sungai Lembing
title_fullStr Micro-Hydro Energy Estimation for Hydrokinetic Energy Harnessing at Sungai Lembing
title_full_unstemmed Micro-Hydro Energy Estimation for Hydrokinetic Energy Harnessing at Sungai Lembing
title_sort micro-hydro energy estimation for hydrokinetic energy harnessing at sungai lembing
publisher Springer Singapore
publishDate 2019
url http://umpir.ump.edu.my/id/eprint/27814/1/Micro-Hydro%20Energy%20Estimation%20for%20Hydrokinetic1.pdf
http://umpir.ump.edu.my/id/eprint/27814/
https://doi.org/10.1007/978-981-13-3708-6_49
_version_ 1822921393934696448
score 13.251813