Systematic approach for developing as-built schedule for construction project
It is widely recognized that construction industry is information intensive and complex industry. However, present trend and proliferations towards multi-participant mega projects have heightened the need for an effective and efficient evaluation and monitoring by stakeholders. A persistent proble...
Saved in:
Main Authors: | Zubair Ahmed Memon,, Muhd Zaimi Abd Majid,, Nur Izzi Md. Yusoff,, Mushairry Mustaffar, |
---|---|
Format: | Article |
Language: | English |
Published: |
2006
|
Online Access: | http://journalarticle.ukm.my/1455/1/2006-14.pdf http://journalarticle.ukm.my/1455/ http://www.ukm.my/jkukm/index.php/jkukm |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
A systematic approach for monitoring and evaluating the construction project progress
by: Memon, Zubair Ahmed, et al.
Published: (2006) -
A systematic approach for monitoring and evaluating the construction project progress
by: Zubair, Ahmed Memon, et al.
Published: (2011) -
A systematic procedure for developing the 3D model to evaluate the construction project progress
by: Ahmed Memon, Zubair, et al.
Published: (2007) -
The use of photogrammetry techniques to evaluate the construction project progress
by: Ahmed Memon, Zubair, et al.
Published: (2006) -
Digitalizing Construction Monitoring (DCM): an overview of Malaysian construction industry and proposing prototype software
by: Ahmed Memon, Zubair, et al.
Published: (2006)